Project designer and production team member for three building additions to the existing senior and junior high school. One addition consists of a new gymnasium and locker room facility out building, another is an elementary school consisting of six classrooms, and the other is a six classroom addition to the high school, including a new entrance.
The gymnasium addition is located behind the existing high school, near existing athletic fields. It has new locker rooms for students, an intermediate corridor containing additional lockers for daily use, and a new hardwood floor for indoor sports. The entry for athletic events is through a new lobby/ gathering space that was designed to accommodate a small assemblage of students or parents and has toilet rooms, a concessions stand, and integrated trophy cases.
WILSON SENIOR/JUNIOR HIGH SCHOOL ADDITIONS
PROJECT INFO
Client: Wilson Central School District
On behalf of Duchscherer Oberst Design
Category: K-12 Education
Completion Date: 1995
Location: Wilson, NY
Project Size: 6,000 SF
This site built by Michael S. Nowak. AIA Copyright © 2017